Sector News

BASF reduces production, adjusts logistics at Ludwigshafen due to heat and drought

August 8, 2018
Energy & Chemical Value Chain

BASF says that due to persistent high temperatures and low water levels on the Rhine River, it has had to reduce production and adjust logistics at Ludwigshafen, Germany, the company’s largest manufacturing site. It declined to provide details on which manufacturing plants are affected.

BASF says it had to adjust production levels at the site because the amount of water withdrawn from the Rhine for cooling purposes, among others, is limited by the local authorities; and the re-entry temperature of the cooling water is also restricted. In addition, the company says that if the water level continues to fall, it will limit the amount of goods that can be transported along the Rhine. At present, despite the low Rhine water levels, inland waterway transport can still be maintained through the use of a larger number of vessels.

In view of current weather and water-level forecasts, BASF is preparing to shift to alternative modes of transport, including rail and road, for outbound and inbound transport from Ludwigshafen. The company notes that delivery bottlenecks may occur if the weather conditions persist. BASF says it is in close contact with its customers. The company says that at this stage it cannot quantify the economic impact the measures will have.

By: Natasha Alperowicz

Source: Chemical Week

comments closed

Related News

September 7, 2024

US researchers uncover catalytic methods for vaporizing plastic waste

Energy & Chemical Value Chain

Researchers have developed a new chemical process capable of vaporizing plastics and converting them into hydrocarbon building blocks for new materials. This catalytic process breaks down two of the most dominant types of post-consumer plastic waste — PE and PP — into monomers, offering a potential solution to packaging waste management.

September 7, 2024

New Neste CEO to take up role in October

Energy & Chemical Value Chain

On 2 September 2024 it has been agreed that Heikki Malinen will assume the role of Neste’s President and CEO on 15 October 2024. He succeeds Matti Lehmus, who will continue as the President and CEO of Neste until 14 October 2024 and then act as an advisor to the company and its management until mid-November 2024 to ensure a smooth transition.

September 7, 2024

Eni, Socar sign MOU for potential biofuels, biorefineries value chain

Energy & Chemical Value Chain

Eni SpA (Rome) and Azerbaijan’s state energy company Socar (Baku) have signed a memorandum of understanding (MOU) for potential cooperation in the biofuels production chain, including the possible conversion of conventional crude oil refineries into biorefineries. A schedule for potential projects was not given.