Sector News

Ineos goes ahead with major cumene project in Germany

July 12, 2019
Energy & Chemical Value Chain

Ineos Phenol, an Ineos subsidiary, today confirmed that it would build a world-scale cumene plant at the company’s Marl, Germany, site to be completed in 2021. Ineos first announced the project two years ago and said it hoped to bring the plant on-line in 2020. The facility will be designed to produce 750,000 metric tons/year and be based on the Badger cumene technology. Badger Licensing is a joint venture between TechnipFMC and ExxonMobil. Ineos already operates a cumene facility at Marl.

The cumene facility will use existing pipeline connections among Ineos’s phenol and acetone production site at Gladbeck, Germany; the Evonik Chemiepark site at Marl; and the BP refinery and steam cracker complex at Gelsenkirchen, Germany. Ineos says the plant’s location will optimize its efficiency by integrating raw materials from the refinery and cracker complex. The site also benefits from the Marl harbor waterway connection.

The cumene plant will secure raw material supplies to the Ineos phenol and acetone plants at Antwerp, Belgium; and Gladbeck. Ineos is the world’s largest producer of phenol and acetone, and the largest consumer of cumene, an essential raw material. Ineos has a combined capacity for phenol of 1.9 million metric tons/year (MMt/y), for acetone of 1.2 MMt/y, and for cumene of 1.2 MMt/y across plants at Antwerp, Gladbeck, and Marl, as well as Mobile, Alabama; and Pasadena, Texas. Ineos has capacity for 900,000 metric tons/year of cumene at Pasadena and 260,000 metric tons/year of cumene at Marl.

Ineos’s Gladbeck plant is the company’s largest single-train phenol manufacturing complex with capacity for more than 650,000 metric tons/year of phenol and 400,000 metric tons/year of acetone. It receives cumene from Ineos’s existing plant at Marl, which is operated by the Ineos styrenics subsidiary on behalf of Ineos Phenol. Benzene and propylene feedstocks for the Marl cumene plant are provided by Ineos. Cumene is shipped to Gladbeck via a 17-kilometer pipeline. The plant at Antwerp is designed to produce 680,000 metric tons/year of phenol.

By Natasha Alperowicz

Source: Chemical Week

comments closed

Related News

April 14, 2024

Nadja Håkansson appointed Chief Executive Officer of thyssenkrupp Uhde

Energy & Chemical Value Chain

The future CEO of thyssenkrupp Uhde, Nadja Håkansson, has held various management positions at Siemens and Siemens Energy and looks back on over 18 years of national and international experience in the areas of supply chain management, operations, sales and corporate management.

April 14, 2024

Neste and Lotte Chemical team up to scale renewable plastics from used cooking oil

Energy & Chemical Value Chain

Neste and South Korean company Lotte Chemical have partnered on a project to elevate the sustainability profile of chemicals and plastics. The partnership’s ambition is to replace fossil resources with renewable raw materials that offer a lower carbon footprint.

April 14, 2024

EU chemical industry confidence shows upward trend

Energy & Chemical Value Chain

At least the confidence in the chemical sector has been seeing an upward trend and the trade balance is recovering as destocking seems to be coming to an end. Citing projections from the European Central Bank, CEFIC states that the level of inflation is expected to fall from 5.4% in 2023 to 2.3% in 2024.

How can we help you?

We're easy to reach